Sitting on 2.3 Wooded Acres in Fayette County just outside of Memphis, TN. This house has 4 bedrooms, 3 1/2 bathrooms with a huge bonus/entertainment room. 3 Car Garage. One of the bedrooms is a Guest Suit. All rooms have their own bathroom with walk-in closets. Library/Study. Many upgrades such as Hardwood floors, granite tops, brown stone hardware, stainless appliances and much more... Just under 4,000 sq ft heated. Come enjoy the French Country. Custom built by Jon Gambrell Construction



Finally got Slur done thanks to Juan Fonseca and Wing Walls. Also got paint on it's way and you can see how much it helps the outside. Also got the copper cupla up. Soon to have painting complete, gutters up and 4 copper 60" tall finials will be added soon. Sod and landscape will wrap the outside up along with an outside desk or concrete patio in the back. Carriage Doors are up as well
John, owner of Stone Perfection, did an awesome job and his team. He gave us plenty for our money, beat his deadline by a week and did great work. We are VERY pleased with each selection for each room. Thanks so much!
Joe Moscan, David and Maria at J & D Tile and Flooring Plus just did an awesome job on the tile and really were dependable and came through for us in a great way. Easy to work with paitent and long suffering (smile). Back Splash in the Kitchen went in, Master Tub Surround, and Seat in Master Shower went in.
Also pictured to the right is the kitchen with the backsplash. As you can see they did a great job and it complements the cabinets and flooring very well. As we've said before all the tile is upgraded through-out the house and with higher-end upgrades in the Master Bathroom and Kitchen.
Joe, David and Maria at J & D Tile were great working with me and getting started when they said they would. As you can see from this one picture the tile is AWESOME!!! The Kitchen I picked out four different tiles from the same company and then had them put together with black grout. The Master Bathroom Shower and floor is incredible and the upstairs bathrooms as well. There's not another house in the area with tile like this, for sure!!! Thanks for the great work, your crew is very efficent and there everyday moving... Next, we paint and start wrapping up...
Steve and David at Designer Cabinets are AWESOME!!! They did a great job getting us great looking cabinets at an awesome price and a great look. The Kitchen and Master are glazed. Plus there is going to be an awesome glazed island that has a old finish on it to set the cabinets off. We also added ribbon around the top in the Kitchen and added upgraded hardware in the kitchen on the cabinets. Once the tile is in and the granite tops, it is going to look really AWESOME!!! onto Trim and Tile....
Craig & Amanda at Old World Flooring and their crews did a great job putting the floor down fast and getting us a great price. These are nailed down white pine and they are in the Great Room, Entry Way, Study, Dinning Room, Gallery, and Powder Room. Soon we'll be ready to have Old World back out to finish up sanding and staining them
Engineered Comfort Inc did an awesome job on the insulation. 6 business days from start to finish with some touch ups. We upgraded the insulation to what is called Blown Silos. It great enhances your engery efficencies and lowers your utility bill greatly. Walter Nelms, owner of Engineered Comfort and his crew did an awesome job getting it in and finished. We also upgraded the Master Bedroom with extra insulation for better heating and air conditioning control and for sound protection from the kitchen, garage and Powder room. Not only, as you
can see, is the insulation tightly packed where no air can escape or come in, the crews of Engineered Comfort made sure that all windows, doors and any other cracks, opening, etc... were sealed tight. It was worth every penny! Sheet-Rock started July 18, 2006 and should be complete by Monday, July 31, 2006 and that day or the 1st og August 2006
Ordered the Cabinets on Friday, Coffee Glazed unique design from Designer Cabinets of Memphis. All cabinets in the house will be the same design, the Master Bedroom and Kitchen will be glazed. The island is incredibly awesome and will have a unique finish and glaze to offset the kitchen and the coffee stain. The color will be perfect for the granite ordered and the stainless steel applicances. They will be installed 4-6 weeks from now.
Juan Fonseca and his guys headed up by Jesus, did an awesome job and fast to!!! Thanks so much for completeing this so well. The slur will be one of the last things we complete after we get the porches and wing walls complete. The Chimney is awesome!! Thanks to Moses and Jesus and Juan for making that happen!!
Thanks to Ellendale Electric and their electrician Keith, the electrical work is coming along nicely and should be wrapping up the last week of June getting us ready for inspection before we start insulation. Then sheet-rock which will leave us 60 days to completion Lord willing. Thanks Keith for being patient with our changes and to your helper. I know it's been hot!! Thanks for the great work you guys have done so far!
Thanks to Austion Heating and Air the HVAC has been completed on time as promised with an excellent job done. Three units, one for upstairs, on for downstairs and one for the Master Suit. All three units are located on the third floor with easy access.
It was so good to see them start Monday after Easter April 17, 2006 on the framing. By the time I got home on Wednesday they already had the first floor pretty much done. This week they should wrap up the second floor and start roofing, weather permitting. The Lord has been so good to let us come this far.