We completed the house on November 28, 2006 and closed on the house on November 29, 2006 - The Lord blessed us with a great couple who we hope will enjoy the house for years to come. Be sure and look around and let us build you a house. We are starting our next house in The Cloister's where the Vesta Home Show 2006 was held in Fayette County. We should break ground in January 2007. Please visit www.JonGambrellConstruction.com for more
Sitting on 2.3 Wooded Acres in Fayette County just outside of Memphis, TN. This house has 4 bedrooms, 3 1/2 bathrooms with a huge bonus/entertainment room. 3 Car Garage. One of the bedrooms is a Guest Suit. All rooms have their own bathroom with walk-in closets. Library/Study. Many upgrades such as Hardwood floors, granite tops, brown stone hardware, stainless appliances and much more... Just under 4,000 sq ft heated. Come enjoy the French Country. Custom built by Jon Gambrell Construction
Tuesday, December 05, 2006
A LOOK INSIDE
INSIDE COMPLETE
Friday, October 27, 2006
Jen-Air Cooktop Installed
Outside Update
Finally got Slur done thanks to Juan Fonseca and Wing Walls. Also got paint on it's way and you can see how much it helps the outside. Also got the copper cupla up. Soon to have painting complete, gutters up and 4 copper 60" tall finials will be added soon. Sod and landscape will wrap the outside up along with an outside desk or concrete patio in the back. Carriage Doors are up as well
Frameless Glass Door
Plumbing Fixtures 95% Complete
Light Fixtures & Outlets Complete
Thursday, September 28, 2006
Granite Counter Tops Installed
John, owner of Stone Perfection, did an awesome job and his team. He gave us plenty for our money, beat his deadline by a week and did great work. We are VERY pleased with each selection for each room. Thanks so much!
As stated on the website, ALL counter tops through out the house are granite natural stone. (Kitchen, Laundry Room, Master Bathroom, Powder Room, Guest Suit Bathroom, and Jack'n'Jill Bathroom)
As stated on the website, ALL counter tops through out the house are granite natural stone. (Kitchen, Laundry Room, Master Bathroom, Powder Room, Guest Suit Bathroom, and Jack'n'Jill Bathroom)
TILE Complete
Joe Moscan, David and Maria at J & D Tile and Flooring Plus just did an awesome job on the tile and really were dependable and came through for us in a great way. Easy to work with paitent and long suffering (smile). Back Splash in the Kitchen went in, Master Tub Surround, and Seat in Master Shower went in.
When the Framless glass door goes on the Master Shower it will set this bathroom apart from any other in the area. It is no doubt impressive. A must see.
Also pictured to the right is the kitchen with the backsplash. As you can see they did a great job and it complements the cabinets and flooring very well. As we've said before all the tile is upgraded through-out the house and with higher-end upgrades in the Master Bathroom and Kitchen.
When the Framless glass door goes on the Master Shower it will set this bathroom apart from any other in the area. It is no doubt impressive. A must see.
Also pictured to the right is the kitchen with the backsplash. As you can see they did a great job and it complements the cabinets and flooring very well. As we've said before all the tile is upgraded through-out the house and with higher-end upgrades in the Master Bathroom and Kitchen.
SEPTIC SYSTEM COMPLETE
Friday, September 08, 2006
TILE is being installed...
Joe, David and Maria at J & D Tile were great working with me and getting started when they said they would. As you can see from this one picture the tile is AWESOME!!! The Kitchen I picked out four different tiles from the same company and then had them put together with black grout. The Master Bathroom Shower and floor is incredible and the upstairs bathrooms as well. There's not another house in the area with tile like this, for sure!!! Thanks for the great work, your crew is very efficent and there everyday moving... Next, we paint and start wrapping up...
Sunday, September 03, 2006
Cabinets Installed (Designer Cabinets)
Steve and David at Designer Cabinets are AWESOME!!! They did a great job getting us great looking cabinets at an awesome price and a great look. The Kitchen and Master are glazed. Plus there is going to be an awesome glazed island that has a old finish on it to set the cabinets off. We also added ribbon around the top in the Kitchen and added upgraded hardware in the kitchen on the cabinets. Once the tile is in and the granite tops, it is going to look really AWESOME!!! onto Trim and Tile....
Hardwood Floors go down
Craig & Amanda at Old World Flooring and their crews did a great job putting the floor down fast and getting us a great price. These are nailed down white pine and they are in the Great Room, Entry Way, Study, Dinning Room, Gallery, and Powder Room. Soon we'll be ready to have Old World back out to finish up sanding and staining them
Drywall Installed and Completed by Mark Barnett Drywall
Wednesday, July 19, 2006
Insulation (Blown Silos) Complete
Engineered Comfort Inc did an awesome job on the insulation. 6 business days from start to finish with some touch ups. We upgraded the insulation to what is called Blown Silos. It great enhances your engery efficencies and lowers your utility bill greatly. Walter Nelms, owner of Engineered Comfort and his crew did an awesome job getting it in and finished. We also upgraded the Master Bedroom with extra insulation for better heating and air conditioning control and for sound protection from the kitchen, garage and Powder room. Not only, as you can see, is the insulation tightly packed where no air can escape or come in, the crews of Engineered Comfort made sure that all windows, doors and any other cracks, opening, etc... were sealed tight. It was worth every penny!
Sheet-Rock started July 18, 2006 and should be complete by Monday, July 31, 2006 and that day or the 1st og August 2006
Tuesday, July 04, 2006
Cabinets Ordered
Ordered the Cabinets on Friday, Coffee Glazed unique design from Designer Cabinets of Memphis. All cabinets in the house will be the same design, the Master Bedroom and Kitchen will be glazed. The island is incredibly awesome and will have a unique finish and glaze to offset the kitchen and the coffee stain. The color will be perfect for the granite ordered and the stainless steel applicances. They will be installed 4-6 weeks from now.
Inspections Completed
Captian Dormer Roof Complete
Brick Complete
Juan Fonseca and his guys headed up by Jesus, did an awesome job and fast to!!! Thanks so much for completeing this so well. The slur will be one of the last things we complete after we get the porches and wing walls complete. The Chimney is awesome!! Thanks to Moses and Jesus and Juan for making that happen!!
Thursday, June 22, 2006
Inside Electric Started...
Thanks to Ellendale Electric and their electrician Keith, the electrical work is coming along nicely and should be wrapping up the last week of June getting us ready for inspection before we start insulation. Then sheet-rock which will leave us 60 days to completion Lord willing. Thanks Keith for being patient with our changes and to your helper. I know it's been hot!! Thanks for the great work you guys have done so far!
Brick Continued...
Brick work started...
Plumbing Rough-in Complete
HVAC Complete
Thanks to Austion Heating and Air the HVAC has been completed on time as promised with an excellent job done. Three units, one for upstairs, on for downstairs and one for the Master Suit. All three units are located on the third floor with easy access.
Thanks to Chad, Gary and Greg for all their great work!
Thanks to Chad, Gary and Greg for all their great work!
Friday, June 02, 2006
Roof & Prime Completed
Monday, April 24, 2006
FRAMING (1st Floor)
It was so good to see them start Monday after Easter April 17, 2006 on the framing. By the time I got home on Wednesday they already had the first floor pretty much done. This week they should wrap up the second floor and start roofing, weather permitting. The Lord has been so good to let us come this far.
The Slab (FINALLY!!!!)
WELL
Rough-in Plumbing
Friday, March 17, 2006
Our Sign Is Up FINALLY!!
We Break Ground
March 2006 Day Before Start
March 13, 2006 taken the day before we broke ground to start grading for foundation. This shot was taken from the right side of the lot looking back to the right back corner and over to the left. The house will sit close to the middle of this image to the left of the ditch, 100 feet back from the middle of the road.
LOT #101 In The Beginning
FIRST FLOOR LAYOUT
SECOND FLOOR LAYOUT
Woodsedge Lot #101