Friday, October 27, 2006

Jen-Air Cooktop Installed

This was an upgrade in the Appliances. Jen-Air Cooktop with 5 places to cook your meals with stainless steal trim and knobs.

Outside Update

Finally got Slur done thanks to Juan Fonseca and Wing Walls. Also got paint on it's way and you can see how much it helps the outside. Also got the copper cupla up. Soon to have painting complete, gutters up and 4 copper 60" tall finials will be added soon. Sod and landscape will wrap the outside up along with an outside desk or concrete patio in the back. Carriage Doors are up as well

Frameless Glass Door

This was an upgrade. A frameless glass door with upgraded oil-rubbed hardware for the Master Shower. This is elgant and impressive. This is a must see in person, the picture doesn't do it justice. Thanks to Brad Savage for his help with this.

Plumbing Fixtures 95% Complete

Salmon Plumbing got our Plumbing Fixtures installed along with the master whirlpool and garbage disposal. We upgraded the fixtures in the Kitchen and Master Bathroom. All fixtures are Oil-Rubbed through out the house.

Light Fixtures & Outlets Complete

Thanks to Ellendale Electric, all light fixtures and outlets, switches etc. have been installed. All lights have been upgraded with special attention to the Entry, Dinning Room and Breakfast Room. A ton of can lights and ceiling fans in Great Room, Mater and Guest Suit.