Friday, March 17, 2006

Our Sign Is Up FINALLY!!

We finally put the sign up and should have the footing and slab in by the end of the month. It looks like it might just happen, it's on it's way...

We Break Ground


Taken March 16, 2006 the day after completion of the grade. We re-measured and re-flaged the corners of the house. We also put up our sign and the lot number. It's finally on it's way

March 2006 Day Before Start


March 13, 2006 taken the day before we broke ground to start grading for foundation. This shot was taken from the right side of the lot looking back to the right back corner and over to the left. The house will sit close to the middle of this image to the left of the ditch, 100 feet back from the middle of the road.

LOT #101 In The Beginning



This is a shot of Lot #101 on January 31, 2006 before anything was done to it. This picture is shot from the left front of the lot, looking back to the far right back corner.

FIRST FLOOR LAYOUT


This is the first and primary floor of The French Country house plan. You'll notice a study/library as you enter the home to the right. One huge great/family room. A nice size Master Suit with a huge walk-in closet and unique Master Bath.

SECOND FLOOR LAYOUT



This is the layout of the second/upper level floor in The French Country. 3 bedrooms and an explandable bonus/game room up stairs with balcony looking down to foyer. Each room has direct access to bathroom with one as a guest suite and then a jack-n-jill setup. Also each room has a walk-in closet.

Woodsedge Lot #101









This is the rear elevation of The French Country. Most of the
house is single story except in the front from the outside elevation with two stories inside. A porch off the great room and kitchen and then another patio in the rear which is private to the Master Suite.